You can download the BSPHCL New Electricity Connection Form High Tension Supply PDF for free by using the direct link provided below on the page.

 

BSPHCL New Electricity Connection Form (High Tension Supply) PDF

BSPHCL is a state-owned electricity regulation board that operates within the state of Bihar. They are responsible for providing reliable and efficient electricity services to the residents and businesses in Bihar. If you’re looking to get a new electricity connection from BSPHCL, you’ll need to follow a few steps. Firstly, you’ll need to download the BSPHCL New Electricity Connection Form (High Tension Supply) in PDF format. This form is essential for initiating the process of getting a new electricity connection. You can find the download link for the form below.

Once you’ve downloaded the form, take some time to carefully read through it. The form will require you to provide various details and information. It’s crucial to fill out the form accurately to ensure a smooth process. Let’s go over some of the key sections that you’ll need to complete in the form:

1. Personal Information: Start by providing your personal details, such as your name, address, contact number, and email address. Make sure to double-check all the information for accuracy.

2. Type of Connection: Indicate whether you’re applying for a high tension supply connection. This information helps BSPHCL determine the appropriate infrastructure and resources needed for your connection.

3. Load Requirement: Specify the load requirement for your electricity connection. This refers to the amount of power you anticipate needing. It’s essential to provide an accurate estimate to ensure the proper allocation of resources.

4. Location Details: Provide the exact location where you require the electricity connection. Include the full address, including the house number, street name, city or town, district, and state. This information helps BSPHCL identify the specific area where the connection is needed.

5. Supporting Documents: You may be required to submit certain supporting documents along with the form. These documents could include proof of identity, proof of address, and any other relevant certificates or permits. Make sure to gather all the necessary documents before submitting your application.

6. Signature: Once you have filled out all the required sections of the form, don’t forget to sign it. Your signature serves as your official confirmation and consent for the information provided.

 

BSPHCL New Electricity Connection Form (High Tension Supply)

  • To begin the process of obtaining a new electricity connection, you have a couple of options. You can either visit the respective office and obtain the form in person, or you can download it from the link provided below. If there is a fee associated with obtaining the form, make sure to pay it accordingly.
  • Once you have the form in your hands, it’s time to fill it out. Remember to provide accurate and complete information. Additionally, you’ll need to include the required documentation along with the filled-out form. One crucial document to include is a licensed electrical contractor who will be responsible for the wiring.
  • After submitting your application and documents to the concerned authorities at the respective office, they will review everything. If all the submitted documents are in order, they will inform you about the fee that needs to be paid for the procedure. Once you make the payment, you will receive a receipt. Keep this receipt safe for future reference.
  • Next, your application will go through internal processing. A technician will be assigned to inspect the premises on a scheduled date, and you should be present during the inspection. The technician will mark the appropriate location for the meter and the entry point for the supply mains and other necessary equipment. They will also fill out a survey report detailing their findings.
  • If the survey report indicates that it is feasible to provide the electricity supply, you will receive intimation about the sanction. However, it’s important to comply within the specified period as per the norms from the date of power sanction. Failure to do so may result in the cancellation of the power sanction and registration. In cases where the report shows non-feasibility, you may be asked to bear the additional cost to create viable conditions as advised by the department.
  • Once you have received intimation about the sanction, you can visit the office to inquire about the charges for the service line, initial security deposit, and the cost of the meter or metering equipment. Make the necessary payment and obtain a receipt, along with an application number for reference.
  • Once all the above procedures are complete, the electricity department or company will issue a work order. The concerned Junior Engineer or Assistant Engineer will then arrange to provide the power supply. This may involve the installation of a pole or other necessary infrastructure.