You can download the MPMKVVCL Electricity New Connection Form PDF for free by using the direct link provided below on the page.
MPMKVVCL Electricity New Connection Form PDF
MPMKVVCL, which stands for MP Madhya Kshetra Vidyut Vitaran Company Ltd, is responsible for distributing electricity in Madhya Pradesh. To apply for a new LT supply connection, you’ll need to download the prescribed application form. The first step is to visit the Distribution Centre that covers the area where your premises is situated.
You can find the nearest Distribution Centre by checking the jurisdiction details. Once you’re at the Centre, you’ll need to pay the cost of the form to obtain it. The form is essential for initiating the process of getting a new electricity connection.
If visiting the Distribution Centre is not convenient for you, there is an alternative option. You can download the LT supply application form directly from the MPMKVVCL website. This allows you to access the form without having to physically go to the Centre. Simply visit the website and look for the download link for the form.
By following these steps, you’ll be able to obtain the MPMKVVCL Electricity New Connection Form in PDF format. It’s important to fill out the form accurately and provide all the required information to ensure a smooth process for getting your new electricity connection.
Eligibility for MPMKVVCL Electricity New Connection Form
- To begin, it’s important to note that the applicant should either be the owner or legal occupier of the premises situated within the company’s service area. This ensures that the connection is being requested by the rightful person.
- Now, let’s talk about the type of power supply based on the connected load. If the connected load does not exceed 100 HP (Horsepower), the power supply will be provided at LT (Low Tension). This is suitable for smaller installations.
- On the other hand, if the connected load exceeds 100 HP, the power supply will be given at HT (High Tension). HT supply is required for larger installations that have a higher demand for electricity.
- There is an exception for consumers whose connected load is between 100 HP and 150 HP. If their load falls within this range and they request it, MPMKVVCL may consider supplying power at LT, depending on the company’s discretion. In this case, the consumer will need to bear the cost of extending the 11 KV line up to their premises and installing the required 11/.4 KV transformers. This cost will be in accordance with the existing rules.
- It’s important to note that consumers who wish to receive power at HT should be prepared to execute an agreement for a contract demand of not less than 50 KW (or 60 KVA). This ensures that the consumer has a sufficient demand for the higher tension supply.
- By following these guidelines, you can ensure that you apply for the appropriate type of power supply based on your connected load. Remember to provide all the necessary information and comply with the rules and regulations set by MPMKVVCL.